Confirm PV CT direction reversal

The prototype PV generation arrow defaults away from the PV inverter and toward the PV board. Reversing it toward the PV inverter may reverse the measured generation direction. Check the exact inverter manufacturer’s CT polarity and commissioning instructions before installation; polarity conventions vary by manufacturer.

DESIGN LAB / INTERACTIVE PROTOTYPE

One installation. Four ways to see it.

Connect the system, then tell us what differs. Select a connection to edit its details.

Installation schematic

Single phase · 230 V

Select equipment · download the PDF or copy the configuration link to keep changes

Electrical

Power connections from the incoming supply to the home and BESS.

DRAFT

Add schematic to project

Loading projects…

electrical installation schematicIncoming supply to utility meter · Length not setMeter tails · meter to Henley · Length not set · 25 mm² · Meter tails (double-insulated)Meter tails · meter to Henley · Length not set · 25 mm² · Meter tails (double-insulated)BESS inverter final circuit · 8 m · 6 mm² · H07RN-FBESS inverter → Battery · Length not setMeter tails · Main consumer unit · Length not set · 25 mm² · Meter tails (double-insulated)Meter tails · BESS distribution board · Length not set · 25 mm² · Meter tails (double-insulated)Incoming supply · Earthing not setIncoming supplyEarthing not setUtility meter · Electronic (non-smart)Utility meterElectronic (non-smart)CT · CT × 1 · supplied with inverterCT × 1 · supplied with inverterHenley junction · Split to distribution boardsHenley junctionSplit to distribution boardsBESS distribution board · Max demand not setBESS distribution boardMax demand not setBESS inverter · 1-phase · 230 VBESS inverter1-phase · 230 VBattery · Model not selectedBatteryModel not selectedMain consumer unit · Max demand not setMain consumer unitMax demand not set

Select a cable to edit its length, CSA and type. Automatic routing · 16-unit drawing clearance. Gapped crossings are not junctions. Physical cable segregation is not calculated.

Drag blank space to pan · Ctrl/⌘ + wheel or pinch to zoom · focus the canvas and press + / −.

Final BESS AC run only · Breaker-current allowance · Load drop: Not yet verified · Generation rise: Not yet verified

ElectricalInternetMeasurement
SCHEMATIC / NOT TO SCALESame equipment and edits in every view
Built around the measurement, not extra hardware.

The utility meter records billing energy. The selected grid measurement supplies control information.

Prototype only. Download a single A3 drawing with circuit totals and project details, or copy the configuration link to reopen it later. Engineering checks remain preliminary.