DESIGN LAB / INTERACTIVE PROTOTYPE
One installation. Four ways to see it.
Connect the system, then tell us what differs. Select a connection to edit its details.
Installation schematic
Single phase · 230 V
Select equipment · download the PDF or copy the configuration link to keep changesElectrical
Power connections from the incoming supply to the home and BESS.
Select a cable to edit its length, CSA and type. Automatic routing · 16-unit drawing clearance. Gapped crossings are not junctions. Physical cable segregation is not calculated.
Drag blank space to pan · Ctrl/⌘ + wheel or pinch to zoom · focus the canvas and press + / −.
Final BESS AC run only · Breaker-current allowance · Load drop: Not yet verified · Generation rise: Not yet verified
ElectricalInternetMeasurement
SCHEMATIC / NOT TO SCALESame equipment and edits in every view